Our installation process

We assess the site, define the scope, complete the installation, test the system, and provide project documentation at handoff.

Building wiring diagram showing the equipment rack, patch panel, and horizontal and backbone cabling to each work area

Site assessment

We inspect the existing cabling, equipment locations, cable pathways, available power, mounting conditions, and site access. We also document the devices, coverage areas, and network requirements included in the project.

The assessment identifies site conditions that affect materials, labor, scheduling, and equipment placement.

Colleagues planning a technical project with laptops and documents

Scope and system design

We prepare a scope covering cable types and quantities, equipment, device locations, installation methods, testing, and documentation. The proposal identifies the work included, pricing, and any responsibilities outside our scope.

Changes are reviewed and approved before installation is scheduled.

Network technician installing and checking cables in a server rack

Installation and testing

We install and terminate the approved cabling, mount equipment, configure network devices, and position access points and cameras.

Installed cable runs are tested, device connectivity is verified, and camera views and wireless operation are checked where applicable.

Two people handing off completed project documents

Handoff and documentation

We review the completed installation and provide the applicable cable schedule, port labels, equipment information, and access details. We explain the installed system and answer operational questions.

Any incomplete or follow-up items are documented before the project is closed.